Grid connection

Solar Panel Connection to the Electricity Grid

Everything you need to know about connecting solar panels to Latvia's electricity grid — application, technical conditions, micro-generator registration and net metering. We manage all documentation and the entire process on your behalf.

20–30 w.d.Application review
FullProcess managed by us
Net meteringIncluded
5 min.Response time
Response in 5 min.
All documentation handled by us
Net metering included
Serving all of Latvia

Grid Connection Process — Step by Step

Connecting solar panels to the electricity grid may seem complicated, but with the right support the process runs smoothly and predictably. We have completed this process hundreds of times and know every step inside out.

Technical conditions

We submit the application to the grid operator for technical conditions. Review takes 20–30 working days. We monitor status and communicate with the grid operator on your behalf.

Electrical design

A certified electrical designer prepares the system design in accordance with the grid operator's technical conditions and LVS EN standards. Often done in parallel with step one.

Installation

Certified electricians install the panels, inverter and electrical wiring in accordance with the design. We often carry out installation while the grid application is being processed — saving overall time.

Connection and meter

The grid operator inspects the installation and approves connection. A bidirectional meter is installed, recording both energy consumed and energy fed to the grid.

5️⃣

Micro-generator registration

The system is registered as a micro-generator and net metering begins. You receive a certificate and can track generation through the inverter monitoring app.

Commissioning

You receive the full documentation package, a system walkthrough and monitoring setup. The system is ready to generate energy and save money.

What Is a Micro-Generator?

A micro-generator is an electricity generation unit with a capacity of up to 11.04 kW that a homeowner can register through a simplified process. This is the most important category for private home solar panel systems — the vast majority fall here.

  • Micro-generator (up to 11.04 kW) — simplified process, no complex building permit required
  • Mini-generator (11.04–43.5 kW) — slightly more complex process, suitable for larger homes and small businesses
  • Small power plant (above 43.5 kW) — full connection process, typically for businesses

Net Metering — How It Works

Latvia operates a net metering system — generated and consumed energy are offset against each other. This means:

  • During the day — generated energy is used directly in the home, surplus feeds into the grid
  • At night and on cloudy days — energy is drawn from the grid as normal
  • At year-end — final settlement; if you have generated more than consumed, surplus energy is compensated at the trading price
  • In summer — the system generates more than the home uses, surplus accumulates as a credit
  • In winter — lower generation, drawing from the summer credit balance

Net metering means you don't need to worry about the instantaneous balance — the grid acts as a virtual battery. This makes solar panels effective even without a physical battery.

Documents Required for the Grid Application

You provide

Land register extract or proof of ownership, boundary plan or site plan. Property ownership documents are usually sufficient.

We prepare

The electrical installation design, inverter and panel compliance certificates, the application form and all documents required by the grid operator — at no extra charge.

Installation and Grid Connection — Parallel Process

One of the most common questions: "Can panels be installed before the grid approval?" The answer is yes, with a condition. The physical installation (panels on the roof, cable mounting) can be done before the final approval, but the system may only be switched on and connected to the grid after the grid operator's approval.

We plan installation so that it takes place during the grid operator's review period — significantly reducing the total time from application to a working system.

We manage the entire process on your behalf

Grid application, document submission, status tracking, coordination — we do everything. You don't need to contact the grid operator or know the procedures. We keep you informed at every step and alert you if your involvement is needed.

Why Choose Us?

Experience

500+ successful grid connections — we know every detail and the most common obstacles, and how to navigate them.

Full service

Everything included — design, application, coordination, connection. No extra charge for documentation.

Optimised process

We carry out installation and documentation in parallel to minimise total time from decision to working system.

Regular updates

We keep you informed about the status of each step — you always know where your project stands.

Certified specialists

Certified electricians and designers — a mandatory grid operator requirement and essential for your system's safety.

All of Latvia

We serve clients across Latvia — familiar with regional grid operator differences and requirements.

Frequently Asked Questions About Grid Connection

The grid operator reviews the application and issues technical conditions within 20–30 working days. Including document preparation and installation, the full process from application to a working system takes 2–4 months. We manage the entire process on the client's behalf.
A micro-generator is an electricity generation unit with a capacity of up to 11.04 kW that a homeowner can connect to the grid through a simplified process without a complex building permit. The vast majority of private home solar panel systems fall into this category. Systems with a capacity of 11.04–43.5 kW are mini-generators with a slightly more complex connection process.
Latvia operates a net metering system. Generated energy is offset against consumed energy. At year-end there is a final settlement — if you have generated more than you have consumed, the surplus energy is compensated at the trading price. This means summer surplus offsets winter consumption.
The grid application requires: a land register extract or proof of ownership, a site plan, the electrical installation design (we prepare this) and inverter compliance certificates (we supply these with the equipment). We prepare and submit all required documents.
The physical installation can be carried out before final approval, but the system may only be switched on and connected to the grid after the grid operator's approval. We often carry out installation in parallel with the grid application process — saving overall time.

Question About Grid Connection or Installation?

Fill in the form and our specialist will contact you within 5 minutes. We'll answer all questions and help you start the process.

  • Grid application included in price
  • All documentation handled by us
  • Parallel installation process
  • Regular status updates